On the Critical Path
Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.
Genre: Documentary
Watch On the Critical Path (1971) Free Online in HD
Stream On the Critical Path online for free in full HD on StreamVault — no sign up, no subscription. Full movie available to watch instantly in high quality.
Watch Trailer
No trailer available
Related Movies

2019
The Atom: A Love Affair
6.4HD
1980
Developing Tomorrow’s Energy
0.0HD

2024
Radioactive: The Women of Three Mile Island
6.3HD
1969
Douglas Point Nuclear Power Station: Design and Construction
0.0HD
1963
Nuclear Power Demonstration
0.0HD
1973
This Nuclear Age
0.0HD

1971
On Power Refuelling
7.0HD
2014
Th (Part 11: Dr. Helen Caldicott)
5.1HD

2017
The New Fire
0.0HD
2013
Uranium Drive-In
0.0HD
1968
Douglas Point Nuclear Power Station
0.0HD
1973
Nuclear Power Reactor - Pickering
0.0HD